mNAV.com Insights (Formerly MicroStrategist)
  • Back to mNAV.com
Sign in Subscribe
The Bitcoin Treasury Globe:  Live Map of Every Public Company Holding Bitcoin
Featured

The Bitcoin Treasury Globe: Live Map of Every Public Company Holding Bitcoin

"For the first time, you can see the entire corporate Bitcoin landscape in one place." Public companies are racing to add Bitcoin to their balance sheets. What began with a handful of pioneers has become a global movement spanning exchanges, continents, and industries. The Bitcoin Treasury Globe lets
19 Mar 2026 4 min read
The mNAV Bitcoin Treasury Terminal:  Your Command Center for the Bitcoin Treasury Ecosystem

The mNAV Bitcoin Treasury Terminal: Your Command Center for the Bitcoin Treasury Ecosystem

TLDR: Visit the new Terminal (it's really cool) Public companies are rapidly becoming Bitcoin accumulation vehicles. In 2025 alone, the number of firms holding Bitcoin on their balance sheets surged from 74 to more than 190. This has created an entirely new market segment: Bitcoin Treasury Companies (BTC-
12 Mar 2026 6 min read
The Power Law Just Got an Upgrade:  Introducing the Time-Corrected TradingView Quantile Indicator

The Power Law Just Got an Upgrade: Introducing the Time-Corrected TradingView Quantile Indicator

Bitcoin’s price looks chaotic in the short term. But zoom out far enough and a surprisingly stable pattern emerges: Bitcoin has historically followed a power-law growth curve. The pattern was first highlighted by Giovanni Santostasi in 2014 and has since been widely discussed across the Bitcoin research community.
08 Mar 2026 7 min read
Fixing the Early Data Bias in Bitcoin’s Power Law

Fixing the Early Data Bias in Bitcoin’s Power Law

The power law is one of the most widely used models in Bitcoin modelling.  But two hidden assumptions quietly distort the results: 1.     We assume Bitcoin’s statistical clock started on Genesis Day (3 January 2009), and 2.     We unintentionally overweight early data while effectively ignoring recent price action. As
06 Mar 2026 11 min read
From Time to Work: Rethinking Bitcoin’s Power Law

From Time to Work: Rethinking Bitcoin’s Power Law

There’s no such thing as a perfect model, but some are better than others.  In the case of Bitcoin, the power law appears to be the most effective approach for understanding its future trajectory.  Most people simplistically model Bitcoin’s price trajectory since Genesis Day (3 January 2009).  However,
10 Jan 2026 5 min read
When Was Bitcoin Really Born? Separating Genesis Day from Economic Reality

When Was Bitcoin Really Born? Separating Genesis Day from Economic Reality

Today marks 17 years since Bitcoin’s Genesis Block was mined on 3 January 2009. Most people celebrate this date as Bitcoin’s birthday. And in a literal, technical sense, that’s correct. It was the moment the Bitcoin protocol came into existence. But from an economic and modelling perspective,
02 Jan 2026 6 min read
2025: The Year the Bitcoin Halving Cycle Died

2025: The Year the Bitcoin Halving Cycle Died

For more than a decade, Bitcoin investors have anchored their expectations to cycles – a familiar, comforting, predictable rhythm of boom, bust, and recovery. ·         the four-year halving. ·         the US election calendar and ·         a more subtle annual cycle. Previous frameworks, such as Plan B’s Stock-to-Flow (S2F), which revolved
02 Jan 2026 7 min read
Bitcoin vs Gold: Some Christmas Hopium (With Data)

Bitcoin vs Gold: Some Christmas Hopium (With Data)

2025 was meant to be a big year for Bitcoin. We had the Strategic Bitcoin Reserve narrative, expectations of a classic four-year-cycle peak, and no shortage of bullish catalysts in the pipeline. After grinding sideways around $58k for much of 2024, Bitcoin finally ripped around the US election.
25 Dec 2025 6 min read
From Hopium to Fundamentals: The Smart Way to Value BTC Treasury Companies

From Hopium to Fundamentals: The Smart Way to Value BTC Treasury Companies

After a ballistic debut, Bitcoin Treasury Companies (BTC-TCs) have hit their first real test. Once the hottest trade on the market, the sector has crashed hard — with many companies now trading at mNAVs below 1. Investors piled in early to ride Bitcoin’s momentum, chasing leveraged exposure without the
03 Nov 2025 12 min read
Halving Hype vs. Macro Reality: Why Bitcoin Is Set to Catch Up Fast

Halving Hype vs. Macro Reality: Why Bitcoin Is Set to Catch Up Fast

Every four years, the crypto world holds its breath for the next Bitcoin halving — a ritual countdown often credited with triggering explosive rallies followed by massive crashes. But… this ‘cycle’ has been underwhelming, to say the least.   Even Uptoper has been renamed ‘Voltober’.  Many are wondering whether the four-year
25 Oct 2025 7 min read
The Business Cycle Bitcoin Amplifier

The Business Cycle Bitcoin Amplifier

Many factors appear to correlate with Bitcoin’s moves, like: ·         halvings, ·         election cycles, ·         gold, ·         global liquidity (M2), ·         the hash rate, and ·         the S&P 500. But, when you remove the noise, which of these truly matter? Our latest analysis suggests the ISM Purchasing Managers’ Index (PMI) — a key gauge
19 Oct 2025 8 min read
The Great Bitcoin Reset: Pain, Purge, and Setup for the Next Rip?

The Great Bitcoin Reset: Pain, Purge, and Setup for the Next Rip?

After the two-day “Trump Tariff V2” crash, Bitcoin reminded everyone that it can be volatile — it was just taking a nap. The sudden drop cleared a mountain of leveraged positions, resetting the market and setting the stage for an intriguing Q4. No one has a short-term crystal ball.
13 Oct 2025 6 min read
From MicroStrategist to mNAV.com: The Future of Bitcoin Treasury Insights
Featured

From MicroStrategist to mNAV.com: The Future of Bitcoin Treasury Insights

We’re excited to announce that MicroStrategist is rebranding to mNAV.com — a dedicated data analysis and dashboard hub for investors and companies with accretive Bitcoin strategies. Our mission is simple: 1. Empower Bitcoin Treasury Companies to stack Bitcoin smarter and share their progress with investors using our market leading
17 Sep 2025 3 min read
Unpacking mNAV: Why BTC Yield Matters Most

Unpacking mNAV: Why BTC Yield Matters Most

With our upcoming rebrand to mNAV.com imminent, it’s a perfect moment to unpack the question everyone in the Bitcoin Treasury Company (BTC-TC) space is wrestling with: What really drives mNAV? The answer isn’t as complicated as it might seem. At its core, BTC Yield is the
11 Sep 2025 6 min read
The Lookback Edge: How Optimising Yield Windows Turned 5x into 59x

The Lookback Edge: How Optimising Yield Windows Turned 5x into 59x

Everyone agrees that BTC Yield — the change in bitcoin per share — is the ultimate scorecard for Bitcoin Treasury Companies (BTC-TCs). But what often goes unnoticed is how we measure it. The length of the lookback window — whether 30 days, 90 days, or a full year — can completely change the
07 Sep 2025 7 min read
BTC-TCs After the Pullback: Where mNAV Meets Opportunity

BTC-TCs After the Pullback: Where mNAV Meets Opportunity

·         Bitcoin has cooled from ~$124k to ~$107k, but still sits just above its long-term power-law trend (57th percentile). ·         Our models (M2 + hash rate + S&P) point to a ~$122k as a current “fair value” for BTC vs. broader markets. ·         The June pivot aligned with a sharp ETH/
31 Aug 2025 14 min read
A Quantitative Playbook for Investing in Bitcoin Treasury Companies

A Quantitative Playbook for Investing in Bitcoin Treasury Companies

Bitcoin Treasury Companies (BTC-TCs) are rewriting the rules of financial engineering. Inspired by Michael Saylor—an aeronautical engineer turned corporate strategist—the BTC-TC model represents a departure from traditional finance. It exploits inefficiencies in the fiat system and requires us to model it not as a financial instrument,
23 Aug 2025 12 min read
Is Bitcoin Winter Cancelled? Why This Cycle Feels Different

Is Bitcoin Winter Cancelled? Why This Cycle Feels Different

Every four years, like clockwork, the Bitcoin crowd gathers around the charts, waiting for history to rhyme, praying for the legendary 'God candle'. But this time… feels like it might be different. Cycles that once felt reliable — halvings, annual seasonality, even election-fuelled liquidity bursts — are showing signs
02 Aug 2025 9 min read
Inside the Engine Room: How Our BTC-TC Portfolios Power Growth

Inside the Engine Room: How Our BTC-TC Portfolios Power Growth

In this article, we take a closer look under the hood of our BTC-TC portfolio system to help you understand why some companies earn a higher weighting than others—and how our strategies adapt dynamically to market movements. What Drives Our Rankings? A Look at Portfolio Weightings We’ve
28 Jul 2025 9 min read
S-Curves and Sats: Decoding the Future of Bitcoin Treasury Growth

S-Curves and Sats: Decoding the Future of Bitcoin Treasury Growth

Lately, I’ve been laser-focused on one thing: understanding the future growth of Bitcoin Treasury Companies (BTC-TCs). My initial piece — The Half-Life of Bitcoin Treasury Companies — received plenty of ‘constructive’ feedback. But, ironically, since then, we've seen significant mNAV compression, with many BTC-TCs pulling
26 Jul 2025 5 min read
Bitcoin: Flatlining or Coiling to Strike?

Bitcoin: Flatlining or Coiling to Strike?

For what’s meant to be a notoriously volatile asset, Bitcoin has been... well, unusually boring lately—especially for those of us used to the high-octane world of Bitcoin Treasury Companies (BTC-TCs). But zoom out, and a clearer picture emerges. Bitcoin Still Dancing with the Power Law Bitcoin
26 Jul 2025 4 min read
Unlocking BTC-TC Transparency: Capital B’s Live Dashboard Debut

Unlocking BTC-TC Transparency: Capital B’s Live Dashboard Debut

Capital B’s dashboard just dropped—and it’s redefining how investors track BTC per share growth. From Blockchain Group to Capital B: A New Chapter Begins In case you missed the buzz on X, The Blockchain Group has rebranded to Capital B—complete with a sleek new logo, revamped
23 Jul 2025 2 min read
Rocket Fuel or Vapour? What the Shape of BTC Growth Tells Us for BTC-TCs

Rocket Fuel or Vapour? What the Shape of BTC Growth Tells Us for BTC-TCs

People love watching rocket launches. Why? Because you never really know what's going to happen — will they soar to the moon, drift aimlessly, or explode on the launch pad? The same goes for Bitcoin treasury companies (BTC-TCs). Early excitement is thrilling, but it’s what happens after
16 Jul 2025 8 min read
The Half-Life of Bitcoin Treasury Companies

The Half-Life of Bitcoin Treasury Companies

“It’s going up forever, Laura.”  Michael Saylor While this might be true for Bitcoin, Bitcoin treasury companies are different.  They’re not Bitcoin. Investors pay a premium for companies that can stack the fastest.  “It’s going up forever, Laura.”  Michael Saylor While this might be true for Bitcoin,
14 Jul 2025 8 min read
All-Time Highs – Where to Next?

All-Time Highs – Where to Next?

With Bitcoin smashing through its previous all-time highs, we’re entering what some call the fun zone. But where to next?  Are we reaching our peak or just getting started?   In this issue, we zoom out to examine the broader macro trends shaping Bitcoin’s future—and provide the
10 Jul 2025 6 min read
Page 1 of 3 Older Posts →
mNAV.com Insights (Formerly MicroStrategist) © 2026
  • Sign up
Powered by Ghost